Extra work

How to keep construction change orders moving without losing the evidence

Keep a change order moving by identifying the directive, checking authority, collecting scope and resource evidence, and assigning the next review action. Separate a field instruction, a priced proposal and an agreed change order. Complete documentation can reduce avoidable back-and-forth, but it does not guarantee approval or payment.

Find the unresolved item before chasing a signature

A stalled change may be missing direction, scope, rates, a schedule explanation or the correct approver. Asking “any update?” does not fix those gaps. Maintain a register with current state, owner of the next action, date requested and missing information.

For a GC, align the owner-facing change with affected subcontract scope and pricing. For a subcontractor, retain the originating instruction and distinguish a supervisor’s acknowledgment from commercial approval.

Move through six reviewable steps

StepRecord or decision
CaptureWho directed what, where and when; preserve the original message
AuthorityContract procedure and authorized issuer or approver
ScopeOriginal scope, requested difference, revision and exclusions
Price and timeResources, agreed rates and explained schedule effect
ReviewOpen questions, reviewer and next action
AgreementApproved terms, signatures and final document linked to the change

Collect support while the work is visible

Do not assume work must always wait for a signed change order. The executed contract may contain a directive or disputed-work procedure. Follow its requirements and applicable notice process with qualified review.

A T&M signature may acknowledge observed resources without approving price, entitlement or time. Check both authority and signature wording. Keep proposed quantities and rates visibly distinct from agreed ones.

  • Photos with area and date context, retaining originals.
  • Direction and relevant drawing or specification revision.
  • Labor, equipment and materials attributable to the changed work.
  • Ticket signatures with acknowledgment scope stated.
  • Pricing basis and schedule assumptions.

A crew update can initiate a draft

ILLUSTRATIVE EXAMPLE
Downtown Office Tower
Foreman: “Owner wants the Level 6 partition moved. Photo and revised sketch attached.”
Follow-up: Who issued the direction? Which revision? What resources are needed? Has the required approval or notice happened?
Draft: Known scope and resource facts assembled. Unknown price and time stay open.
Next action: PM reviews authority, pricing and notice before sending.

Keep the register and final agreement connected

When agreement is reached, link the executed change to its direction, proposal and evidence. Confirm whether scope, price and time are all settled or whether an express reservation remains. Update the responsible records through the approved process.

The example is illustrative. Magra can help prepare drafts and follow-ups from supplied records; external commercial drafts wait for approval. Confirm the actual handoff before promising automatic Procore entry, since project-system connections are rolling out.

Common questions

Why do change orders take so long to approve?

Unclear authority, incomplete scope, missing resource evidence, disputed price or time and an unassigned reviewer can all stall review. Identify the actual unresolved item.

Can a text message authorize extra work?

Its effect depends on the contract, sender’s authority, content and governing law. Preserve it as evidence, but do not assume it satisfies every notice or authorization requirement.

Can Magra draft a change order from crew texts?

Magra describes drafting from updates, project documents and supplied rates. Missing facts need follow-up, and the contractor reviews the draft before external delivery.

Sources & editorial note

By Magra editorial. Examples are illustrative, not customer results. Not legal advice; executed documents, amendments and applicable law govern. Product availability can change.

Put the record to work.

Magra is the AI project manager for contractors, on your phone.

Explore Magra’s drafting and approval routines · Text Magra

Keep reading